Projects for the weekend of 6/6

  1. Install remaining register covers - Done
  2. Mow the lawn. Please don't rain tomorrow! - Done
  3. Paint the nursery. - Done
  4. Install chair rail in nursery. - Done
  5. Paint the shower area in the powder room. - Done
  6. Touch up other paint jobs. - Done
  7. Make more progress on baseboards. - Almost done
  8. Patch holes in drywall.

OK. So I'm updating this on 6/30, but I'm almost done with the last two projects above. I have about 100 more lft of base shoe to put on, and I have to install a shelf in the nursery, then I'll be done with the loud projects. After that, the baby can arrive and sleep in peace. I should probably only need another 2 mornings before work to wrap up.